Skip to main content

[GreenSketch] Release Notes-V2.48.2(October. 12, 2026)

Written by GreenSketch

1. Added support for generating and downloading a Battery Site Plan in Design.

(1) Design

  • Two new buttons are available: PV (Solar) Site Plan and Battery Site Plan.

  • After adding a Battery Tag, the Battery Site Plan can be viewed online and downloaded.

  • Note: The Battery Site Plan screenshot is centred on the Battery Tag.Design

(2) Overview-Document

  • The Battery Site Plan can also be viewed and downloaded under Overview – Document.

(3) Proposal

  • The Battery Site Map can be viewed in the online Proposal, Proposal PDF, and Job Sheet.

2. Updated product selection sorting to prioritize products available through OSW.

3. Change the page layout where the validity setting function in the left sidebar is located to the default function page when the user opens the proposal.

4. Change the default valid period of proposal from 21 days to 60 days.

Did this answer your question?