Q1: Why can't I find the correct property address in GreenSketch?
A: GreenSketch uses Google Maps for address selection. If a property address does not appear in the search results, try the following:
Check that the address is entered correctly.
Remove any unnecessary spaces.
Refresh the page and clear your browser cache.
Log out and log back in using the latest version of Google Chrome.
Check your internet connection or try another network.
If the address is still unavailable, please provide the full property address and a screenshot of the search results to our support team.
Q2: Why is the satellite imagery outdated or different from the actual property?
A: GreenSketch uses satellite and aerial imagery from external map providers, so images may not always reflect recent construction or property changes. The initial roof selection may use Google Maps imagery, while higher-resolution imagery may be available in the Design section.
If the imagery is outdated, you can:
Request the latest architectural roof plan from the homeowner or builder.
Open the project's Design section.
Upload a clear image of the roof plan.
Manually create the 3D roof model based on the uploaded plan.
Please note that GreenSketch cannot directly control when external satellite imagery is updated.
Q3: How do I generate and download a Site Plan in GreenSketch?
A: You can generate a Site Plan to document the solar system layout and equipment locations.
Follow these steps:
Open the relevant project.
Navigate to the Design section.
Use the Tag tool to mark equipment locations, such as solar panels, inverters and batteries.
Navigate to Project → Documents → Site Plan.
Generate and download the Site Plan PDF.
You can then print the document or share it with your installation team.
Q4: Can I generate or customize a Site Plan for a battery-only or retrofit project?
A: At the time of the support conversations, Site Plan generation required new solar panel placement. For battery-only or retrofit projects without new solar panels, the Site Plan could not be generated.
Some additional customization options were also unavailable, including:
Changing the automatically generated Site Plan title.
Adding the installation date directly to the Site Plan.
Adding customized DC cable routes.
Exporting the Site Plan in CAD format.
As a workaround, you can download the available PDF and use a PDF editor to add certain information manually. These limitations were forwarded to the development team for consideration.
Q5: How do I download a Job Sheet for my installation team?
A: You can generate and download a Job Sheet from the Documents section of your project.
Navigate to: Project → Documents → Job Sheet and select the Job Sheet and download the PDF. You can then share the document with your installation team.
If the Job Sheet cannot be downloaded, try logging out, clearing your browser cache and logging back in. If the issue persists, please provide your project link and a screenshot to our support team.
Q6: How do I manage electricity consumption and Time-of-Use tariffs?
A: GreenSketch allows you to configure electricity consumption and tariff information for energy performance and financial calculations.
To update the information:
Open the relevant project.
Navigate to Energy Plan & Tariff.
Update the customer's electricity consumption.
Select the appropriate tariff type.
Enter the relevant electricity rates and save your changes.
For Time-of-Use tariffs, navigate to: Energy Plan & Tariff → Tariff Type → Time of Use. You can configure different electricity prices for different time periods.
Please note that some advanced features, such as CSV interval data uploads and monthly or quarterly consumption inputs for certain retrofit projects, were not supported at the time of the support conversations.
Q7: How are GreenSketch Free Leads allocated, and why haven't I received any leads?
A: Free Leads are allocated based on lead availability and your GreenSketch ranking.
The ranking factors mentioned in the support conversations include:
Number of projects created.
Number of signed or contracted projects.
Login frequency and platform activity.
Number of cases or examples created.
Registering for the Free Leads programe does not guarantee immediate lead allocation. Maintaining regular platform activity and progressing more projects towards signing may help improve your ranking.
If you have not received any leads, please contact our support team to check the latest lead availability and distribution arrangements.
Q8: How do I create and manage Emily lead-capture links for different salespeople?
A: You can create separate Emily agents for different salespeople, each with an individual lead-capture link.
Navigate to: Emily Smart Quote → + New Agent and enter the required information, including the notification email address. Once the agent has been created, you can share its individual referral link.
If you need to change the email address receiving lead notifications, create a new Emily agent and configure the preferred notification email. If a referral link does not load correctly, try reopening your browser or using another browser. Contact our support team if the issue persists.
Q9: How does Emily recommend installers to potential customers?
A: Emily's installer recommendations are based on several factors rather than distance alone.
These include:
Distance from the customer's property.
Your configured service area.
Your activity on the GreenSketch platform.
Your project conversion rate.
Being the closest installer does not necessarily guarantee that your company will appear first in the recommendation list. Make sure your service area is correctly configured and maintain regular platform activity to improve your recommendation performance.
Q10: How do I invite team members and manage their project access?
A: GreenSketch allows you to invite team members and assign roles to control their access.
To invite a salesperson:
Navigate to Members on the GreenSketch homepage.
Click Invite Team Member.
Enter the salesperson's email address.
Select Sales as their role.
Send the invitation.
Project visibility depends on the member's assigned permissions. Members with company-wide project access may be able to view projects created by other team members.
If you remove a team member, their existing projects and proposals will not be automatically deleted. Admin users can continue accessing those projects.
Q11: How do I reassign projects to another salesperson?
A: You can reassign individual project tasks to another team member through the task assignment settings.
Follow these steps:
Open the relevant project.
Locate the task assignment section.
Select the salesperson you want to assign the task to.
Save your changes.
Please note that changing the task assignee does not automatically update the salesperson displayed in the Proposal or the proposal sender email address.
To change the proposal sender, navigate to: Share Proposal → From Address and select the appropriate authorized email address. Bulk project reassignment was not supported at the time of the support conversations.
Q12: Can I recover deleted projects or manage multiple projects at once?
A: At the time of the support conversations, deleted projects and quotes could not be restored through GreenSketch. Bulk project deletion was also not supported, so projects needed to be deleted individually.
If you want to delete an entire project after sending a proposal, you can delete the project. This will deactivate the proposal link. If you only want to remove one proposal option, you can delete that option without deleting the entire project.
Please make sure you no longer need a project or quote before deleting it.
Q13: How do I connect my OSW account to GreenSketch?
A: You can connect your OSW (One Stop Warehouse) account to GreenSketch to access equipment purchasing options.
To connect your account:
Click Purchase on the GreenSketch homepage.
Follow the instructions to connect your OSW account.
Make sure your OSW account is active and approved.
Check that the ABN registered with OSW matches your GreenSketch company ABN.
If the connection fails, check whether your OSW account has completed its approval process. If the issue persists, please provide a screenshot of the error message to our support team.
Q14: How do I connect GreenSketch with Xero and generate invoices?
A: GreenSketch supports Xero integration for managing invoices from signed projects.
First, connect your Xero account through the Integrations section.
To generate an invoice:
Open the relevant project.
Change the project status to Signed.
Navigate to the Quote section.
Access the generated Invoice PDF.
To transfer the invoice information to Xero, locate the Xero integration option in the Quote section and follow the instructions.
If your customer signed the proposal offline, you can manually change the project status to Signed before accessing the Xero integration.
Q15: How do I transfer project information from GreenSketch to GreenDeal?
A: GreenSketch supports integration with GreenDeal to transfer relevant project information for rebate processing.
Follow these steps:
Open the relevant project.
Locate the Incentive or Rebate button.
Connect your GreenDeal account if you have not already done so.
Follow the instructions to transfer the project information.
You only need to complete the initial account connection once.
Please note that GreenDeal and GreenSketch require separate accounts.
If you want to disconnect your GreenDeal account, please contact our support team to confirm the available process.
Q16: Does GreenSketch support API integrations or exporting data to Excel?
A: At the time of the support conversations, GreenSketch did not provide open API access or support direct exports of Leads, Projects and raw Proposal data to Excel or CSV.
Integrations with external CRM and automation platforms, such as HubSpot, Zapier and GoHighLevel, were also not confirmed. These capabilities had been raised as feature requests.
If you need to integrate GreenSketch with your existing CRM or export project data, please contact our support team with details of your intended workflow and the information you want to transfer.
Q17: How do I add or update product datasheets and warranty documents?
A: You can manage supporting product documents through the My Materials section.
Navigate to: Settings → My Materials and select an existing product or create a new material, then upload the relevant documents where supported.
These may include:
Manufacturer datasheets.
Warranty certificates.
Safety data sheets.
Product specifications.
If a product is missing from the equipment database, please provide its brand, exact model number and manufacturer's data sheet to our support team.
If an uploaded warranty document does not appear in an existing project, check whether it is associated with the correct product model.
Q18: How do I update my company information or resolve an ABN-related account issue?
A: You can manage your company information through: Settings → Company Information and update the relevant details, such as your registered company name, trading name, address or website.
If you cannot register a new account because your ABN is already in use, it may be associated with an existing GreenSketch company account. Please contact our support team with your company name, ABN and registered account details so we can check the account association.
Please note that changes to company information may not automatically appear in existing projects. You may need to update those projects separately or contact our support team for assistance.